Loading... Please wait...

Our Newsletter


Waterproofing

Before wall construction:

As shown in the photo.The dirty,moss and other stain are attached to the front wall  which seriously affects the appearance.After communication between the two parties,we will evaluate the siutuation for the customer and explain the procedures and cost related by the construction

case001.jpg

 

Wall construction: 

Accordind to the construction environment,the personnel sprayed the product on the wall evenly by pressure sprayer.It is different from the past application:this method has a short duration of application,not disturb the neighbors ,not create mess and lower cost.

case002.jpg

Wall construction completed:

After the completion of the construction.It can be clearly found that the wall surface can effectively prevent rainwater penetration,acid resistant thus prevent the wall cracking and other problems.

case003.jpg

 

查看更多案例